The Krzywaniec reservoir is a part of Dychów complex hydraulic engineering, and it was created as a damming up water of the Bóbr river in 42+700 km to wave elevation 73.30 NN. The river valley was divided by three span gate weir and tide gate to derivation channel to ESP Dychów. The Krzywaniec reservoir is currently silted up so that the probable water surface Q1% is going to reach reservoir site embankment which means it poses the flood risk on surrounding area. The authors present restoring the initial situation on Krzywaniec reservoir, and estimated the reduction of flood depending on method of declogging the reservoir using computer simulation performed in HEC-RAS.
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.