Tytuł artykułu

Factors influencing construction Stakeholders’ engagement outcome in Nigeria

Treść / Zawartość

Warianty tytułu

Języki publikacji

EN

Abstrakty

EN
As a result of an increasing cases of community protest and opposition to construction projects in the Niger Delta during the construction stages, the present study investigated factors influencing construction stakeholders‟ engagement outcome. The aim was to determine the severity of factors influencing construction stakeholders‟ engagement in the research environment. Due to the pluralist usage of the term stakeholder, the study examined community stakeholders. Qualitative and quantitative data were collected using semi-structured interview and questionnaire survey administered on 186 respondents selected from two stakeholders groups using snowballing. 32 factors generated individually and collectively from literature, interview and practice were ranked and analysed using descriptive and inferential statistics. Gap between regulatory requirements and public expectations, location of projects, effect of cumulative development effects, poverty, and lack of information disclosure are some of the high ranking factors influencing engagement performance. Further analysis involving Levene‟s Homogeneity test indicates no significant difference in the population ranking opinion of these factors. This heterogeneous distribution demonstrates strong similarity across the population studied. These factors must therefore be smoothened in future construction engagement process to enhance successful project delivery. The study unveils inherent lacunas in construction project management which strongly correlates project performance.

Wydawca

-

Rocznik

Tom

15

Numer

2

Opis fizyczny

p.101-114,ref.

Twórcy

autor
  • School Built Environment, University of Salford, Grater Manchester, M5 4WT, U.K.
autor
  • Department of Building, Faculty of Environmental Studies, University of Uyo, Uyo, Nigeria
autor
  • Department of Quantity Surveying, Faculty of Environmental Studies, University of Uyo, Uyo, Nigeria

Bibliografia

  • [1] Altonen, K. & Sivonen, R. (2009). Response Strategies to Stakeholders Pressures in Global Projects, International Journal of Project Management, 27: 131-141.
  • [2] Amaeshi, K., (2007). Exploring the Institutional Embeddedness of Corporate Stakeholding and Social Responsibility: a Comparative Political Economy Perspective, Unpublished PhD Thesis, Warwick Business School, University of Warwick.
  • [3] Andersson, P. & Johansson, A. (2012). Disturbances of the Surrounding in an Urban Infrastructure Project, MSc Dissertation submitted to the Department of Civil Engineering, Chalmers University of Technology, Sweden. Arbor: University of Michigan Press.
  • [4] Barzilai, G (2003). Communities and Law: Politics and Cultures of Legal Identities. Ann.
  • [5] BDOR & Capener, P. (2007). The Protocol for Public Engagement with Proposed Wind Energy Developments in England: a report for the Renewables Advisory Board and DTI, available @http://www.berr.gov.uk/files/file38708.pdf, accessed on 2/7/13
  • [6] Blood, A. (2013). Stakeholders Engagement: Reclaiming the Balance when Economics Dominate, IAIAConference Proceeding of „‟Impact Assessment: The Next Generation‟‟ 33rd Annual Meeting of the International Association for Impact Assessment 13 – 16th May, Calgary Stampede BMO Centre Calgary, Alberta, Canada.
  • [7] Burningham, K. (2000) Using the language of NIMBY: a topic for research not an activity for researchers. Local Environment, 5(1); 55-67.
  • [8] Caputo, A. (2013). Systemic Stakeholders‟ Management for Real Estate Development Projects, Global Business and Management Research: an International Journal, 5(1): 66-82.
  • [9] Chinyio, B and Olomolaiye, P (2010) (Eds), Construction Stakeholder Management, Oxford: John Wiley & Sons, 23-46.
  • [10] Cleland, D. I. 1999. Project Management - Strategic Design and Implementation, McGraw-Hill.
  • [11] Dada, M.O. (2013). Client and Consultant Organisations‟ Assessment of Design Bid Build Procurement Practice in Nigeria, Journal of Building Performance, 4(1): 1-12.
  • [12] Devellis, R.F. (2003). Scale Development: Theory and Applications (2nd edition). California: Thousand Oaks, Sage.
  • [13] Ekung, S. B. (2013c). Analysis of Stakeholders Impacting Project Outcomes in Conflict Zones, Australian Journal of Building Economic and Property Management in review
  • [14] Ekung, S.; Ogboji, M.; & Okonkwo, E. (2013a). Extenuating Community Protest in Controversial Projects Scenarios in the Niger Delta- a Case for CSR, in Ibrahim, A.D. (ed) (2013). Proceeding of the 1st NIQS Research Conference, Innovative and Sustainable Management of Building and Infrastructure Projects, International Conference Centre, Abuja, September 2-5th.
  • [15] Ekung, S.B. (2013b). An Investigation into the Cost of Stakeholders‟ Engagement in Conflicts Zones, MSc Dissertation Submitted to the School of Built Environment, University of Salford, UK.
  • [16] Erikkson, P.E. (2008). Procurement effects on coopetition on client contractor relationships, Journal of construction Engineering and Management, 134(2); 103-111.
  • [17] Gable C., Shireman B., (2005). Stakeholder Engagement: A three Phase Methodology, Environmental Quality Management, 4(3): 9-24. DOI: 10.1002/tqem.20044
  • [18] Giacomo, L. (2011). Armed Conflicts and Security of Oil and Gas Supplies, CEPS Working Document, Thinking Ahead of Europe, No.352, June.
  • [19] Gjolberg, M. 2009. The origin of corporate social responsibility: global forces or national legacies? Socio-Economic Review, 7, 605-637.
  • [20] Glass, J., Simmonds, M. (2007). “Considerate construction”: Case Studies of Current Practice, Engineering, Construction and Architectural Management, (14)2: 131-149.
  • [21] Greenwood, M. (2007). Stakeholder Engagement: beyond the Myth of Corporate Responsibility, Journal of Business Ethics, 74: 315-327
  • [22] Idoro, G.I., Iyagba, R.O.A. & Odusami, K.T. (2007). Evaluation of the use of Design-bid-build Procurement System in the Nigerian Construction Industry. Construction Research Journal 1(1): 15-25.
  • [23] Ihugba, B.U. & Osuji, O.K. (2011). Corporate Citizenship and Stakeholder Engagement: Maintaining an Equitable Power Balance, Electronic Journal of Business Ethics and Organisation Studies, 16(2): 28 -38.
  • [24] http://urn.fi/URN:NBN:fi:jyu- 201201301092 accessed 3/6/13
  • [25] James N., and Phillips, R., (2010), Stakeholder Engagement, Discourse Ethics and Strategic Management, International Journal of Management Reviews DOI: 10.1111/j.1468- 2370.2009.00279.x available@
  • [26] Jawahar, I.M. & McLaughlin, G.L. (2001). Towards a descriptive Stakeholder Theory: An Organizational Life Cycle Approach, Academy of Management Review, 26(3), 397-414.
  • [27] Kivits RA (2013). Multi-dimensional Stakeholder Analysis: a Methodology Applied to Australian Capital city Airports', PhD thesis, Southern Cross University, Lismore, NSW.
  • [28] Kumar, R. (2011). Research Methodology, a Step-by-Step Guide for Beginners, London: SAGE.
  • [29] Li, B.; Akintoye, A.; Edwards, P.J.; & Hardcastle, C. (2005). Critical Success Factors for PPP/PFI Projects in the UK Construction Industry, Construction Management and Economics, 23: 459-471.
  • [30] Loosemore, M. (2000). Crisis Management in Construction Projects, Virginia: ASCE Press.
  • [31] McCabe, A. C., Keast, R. L., & Brown, K. A. (2006). Community Engagement: Towards Community as Governance, paper presented at the Governments and Communities in Partnership Conference, Melbourne, Australia.
  • [32] Newcombe, R. (2003). From Client to Project Stakeholders: a Stakeholder Mapping Approach, Nottingham UK, Association of Researchers in Construction Management, 43-52.
  • [33] Nguyen, N.H.; Skitmore, M.; Wong, J. & Kwok,W. (2009). Stakeholder Impact Analysis of Infrastructure Project Management in Developing Countries: a Study of Perception of Project Managers in State-owned Engineering Firms in Vietnam, Construction Mana gement and Economics, 27(11): 1129-1140.
  • [34] Odusami, K.T; Iyaba, R.R. & Omirin, M.M. (2003). The Relationship between Project Leadership, Team Composition and Construction Project Performance in Nigeria, Journal of International Project Management 21; 519-527.
  • [35] Ojesina, A.O. 1999: The role of the public in the Environmental Impact Assessment process. In Adewoye, R.O. and Adegoke, O.S. (eds) Capacity Building for Environmental Impact Assessment in the Benue Trough Federal Environmental Protection Agency (FEPA), Abuja, pp. 156-160.
  • [36] Olander, S. & Landin, A. (2005). Evaluation of Stakeholder Influence in the Implementation of Construction Projects, International Journal of project Management, 23: 321-328.
  • [37] Olander, S. (2009). Analysis of External Stakeholder Influence on Construction Projects, Proceeding of 5th Nordic Conference on Construction Economic and Organisation, Raykjavik, Iceland, 10 -12 June.
  • [38] Olander, S., and Landin, A. (2008). A Comparative Study of Factors Affecting the External Stakeholder Management Process, Construction Management and Economics 26(6): 553. Doi:10.1080/01446190701821810
  • [39] Pallant, J. (2010). SPSS Survival Manual: A Step by Step Guide to Data Analysis using the SPSS Program, 4th Edition, New York: McGraw Hill Education
  • [40] Pikaar, E. (2011). Stakeholder Engagement in Shale Exploration Project: Supporting Societal Embedding, MSc Dissertation, Management Technology, Delft University of Technology.
  • [41] Takim, R. (2009). The Management of Stakeholders‟ Needs and Expectations in the Development of Construction Projects in Malaysia, Modern Applied Science, 3(5): 167-175
  • [42] Teo M.M.M and Loosemore M (2012) A New Research Agenda into Community-based Protest in Construction In: Smith, S.D (Ed) Procs 28th Annual ARCOM Conference, 3- 5 September 2012, Edinburgh, UK, Association of Researchers in Construction Management, 1135-1143.

Typ dokumentu

Bibliografia

Identyfikatory

Identyfikator YADDA

bwmeta1.element.agro-b51081f4-924e-49c2-83a0-4f7109832f16
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.