Management of assignment of operational tasks realized in ship power plant

Warianty tytułu

Języki publikacji

EN

Abstrakty

EN
The frequent cause of ships’ detentions by port authorities are abnormalities of ship power plant functioning. Each extended ship lay time in port results in waste of ship operating time thus costs rise to shipowners. This is connected with improper ship power plant management. In order to avoid this, a ship engineer should have at his disposal computer aided system supporting him in managing of ship power plant. Such a system can be worked out on condition that mathematical formula which represents the decision – making process of an engineer has been built. The present work shows approache to the problem according to the situation in which the engineer is made to take certain decisions. In formulation of the most substantial operating states of a ship like lay time in harbour and sea voyage the ‚knapsack algorithm’ was applied. For both approaches objective function was formulated

Słowa kluczowe

Wydawca

-

Rocznik

Tom

15

Numer

1

Opis fizyczny

p.42-51,fig.,ref.

Twórcy

autor
  • Faculty of Marine Engineering, Gdynia Maritime University, Morska 81-87, 81-225 Gdynia, Poland
autor
  • Faculty of Marine Engineering, Gdynia Maritime University, Morska 81-87, 81-225 Gdynia, Poland

Bibliografia

  • 1. Kamiński P.: Formulation of objective function of the decision - making problem in ship power plant. Proceedings of 4thConference on Engineering Design in Integrated Product Development, Zielona Góra 2006
  • 2. Kamiński P.: Identification of elements of decision problem of ship power plant management (in Polish), Proceedings of Polyoptimization & CAD Conference (Materiały Konferencyjne Polioptymalizacja i CAD), Mielno 2006
  • 3. Kamiński P.: Selected problems associated with ship power plant operation (in Polish). Proceedings of the Conference on Design and Management of Realization of Production (Materiały Konferencyjne – Projektowanie i zarządzanie realizacją produkcji), Zielona Góra 2005
  • 4. Kamiński P, Tarełko W., Podsiadło A.: Information sources used in the aiding system for ship power plant management (in Polish). 25th International Symposium on Ship Power Plants (XXV Międzynarodowe Sympozjum Siłowni Okrętowych), Gdańsk 2004
  • 5. McDiarmid C.J.H.: The Solution of a Timetabling Problem. Journal of Institute of Mathematics Applications, 9, pp. 23-34, 1972
  • 6. Smutnicki C.: Algorithms of sequencing (in Polish), Exit, Warszawa 2002.
  • 7. Sysło M.M., Doite N., Kowalik J.S.: Algorithms of discreteoptimization (in Polish), PWN, Warszawa 1995
  • 8. Szwed C., Toczyłowski E.: Optimization of compartment resources in conditions of elastic studying (in Polish), Proceedings of Polyoptimization & CAD Conference (Materiały Konferencyjne Polioptymalizacja i CAD), Mielno 2000
  • 9. Tarnowski W.:Simulation andoptimization inMATLAB software(in Polish), WSM Publishing House -Wydawnictwo WSM, Gdynia 2001

Typ dokumentu