PL EN


Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
2017 | 26 | 2[76] |

Tytuł artykułu

Studies on the ANN implementation in the macro BIM cost analyzes

Autorzy

Treść / Zawartość

Warianty tytułu

PL
O możliwościach zastosowania SSN w analizach kosztowych "macro BIM"

Języki publikacji

EN

Abstrakty

EN
Studies on the ANN implementation in the macro BIM cost analyzes. The paper presents an approach which combines the concept of macro-level BIM-based cost analyzes analyzes and application of artificial intelligence tools – namely artificial neural networks. Discussion and foundations of the proposed approach are introduced in the paper to clarify the problem’s core. An exemplary case study reports the results of initial studies on the application of neural networks for the purposes of BIM-based cost analysis of a buildings’ fl oor structural frame. The results obtained justify the proposal of application of neural networks as a supportive mathematical tool in the problem presented in the paper.
PL
O możliwościach zastosowania SSN w analizach kosztowych „macro BIM”. Artykuł przedstawia podejście, w którym połączono koncepcję analiz kosztowych macro BIM z zastosowaniem narzędzi sztucznej inteligencji – sztucznych sieci neuronowych. W artykule zaprezentowano dyskusję i podstawowe założenia proponowanego podejścia stanowiące wyjaśnienie istoty problemu. Studium przypadku przedstawia wyniki wstępnych badań dotyczących różnego zastosowania sieci neuronowych w analizach kosztów z zastosowaniem BIM na przykładzie oszacowań kosztów konstrukcji nośnej kondygnacji budynku. Uzyskane wyniki uzasadniają propozycję wykorzystania sieci neuronowych jako narzędzia matematycznego rozwiązywania problemu przedstawionego w artykule.

Wydawca

-

Rocznik

Tom

26

Numer

Opis fizyczny

p.183-192,fig.,ref.

Twórcy

autor
  • Institute of Building and Transport Management, Tadeusz Kosciuszko Cracow University of Technology, Cracow, Poland

Bibliografia

  • Attalla, M. i Hegazy, T. (2003). Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression. Journal of Construction Engineering and Management, 129(4), 405-411.
  • Azhar, S. (2011). Building information modeling (BIM): Trends, benefits, risks, and challenges for the AEC industry. Leadership and Management in Engineering, 11(3), 241-252.
  • Bishop, C.M. (1995). Neural networks for pattern recognition. Oxford: Oxford University Press.
  • Chan, S.L. i Park, M. (2005). Project cost estimation using principal component regression. Construction Management and Economics, 23(3), 295-304.
  • Eastman, C.M., Teicholz, P., Sacks, R. i Liston, K. (2011). BIM handbook: A guide to building information modeling for owners, managers, designers, engineers and contractors. New York: John Wiley & Sons.
  • Goucher, D. i Thurairajah, N. (2012). Advantages and challenges of using BIM: A cost consultant’s perspective. 49th ASC Annual International Conference, California Polytechnic State University (Cal Poly), San Luis Obispo, California.
  • Fan, S.L., Wu, C.H. i Hun, C.C. (2015). Integration of Cost and Schedule Using BIM. Journal of Applied Science and Engineering, 18(3), 223-232.
  • Haykin, S. (1994). Neural Networks: A Comprehensive Foundation. New York: Macmillan College Publishing Company.
  • Juszczyk, M. i Leśniak, A. (2016). Site Overhead Cost Index Prediction Using RBF Neural Networks. DEStech Transactions on Economics and Management (icem).
  • Kogut, P. i Tomana, A. (2013). 4D and 5D applications in BIM technology. Computer Methods in Mechanics 27–31 August 2013, Poznan, Poland (CMM-2013).
  • Minister of Infrastructure (2002). Regulation of the Minister of Infrastructure dated 12th April 2002 on technical conditions to be met by buildings and their location (consolidated text).
  • Osowski, S. (2013). Sieci neuronowe do przetwarzania informacji. Warszawa: Oficyna Wydawnicza Politechniki Warszawskiej.
  • Sacks, R., Koskela, L., Dave, B.A. i Owen, R. (2010). Interaction of lean and building information modeling in construction. Journal of Construction Engineering and Management, 136(9), 968-980.
  • Sunil, K., Pathirage, C. i Underwood, J. (2015). The importance of integrating cost management with building information modeling (BIM). International Postgraduate Research Conference (IPGRC 2015).
  • Tadeusiewicz, R. (1993). Sieci neuronowe, 180. Warszawa: Akademicka Oficyna Wydawnicza.
  • Tomana, A. (2015). BIM. Innowacyjna technologia w budownictwie. Podstawy, standardy, narzędzia. Kraków: PWB MEDIA Ździebłowski Spółka Jawna.
  • Williams, T.P. (2002). Predicting completed project cost using bidding data. Construction Management & Economics, 20(3), 225-235.
  • Wilmot, C.G. i Mei, B. (2005). Neural network modeling of highway construction costs. Journal of Construction Engineering and Management, 131(7), 765-771.
  • Zima, K. (2015). The Case-Based Reasoning model of cost estimation at the preliminary stage of a construction project. Procedia Engineering, 122, 57-64.

Typ dokumentu

Bibliografia

Identyfikatory

Identyfikator YADDA

bwmeta1.element.agro-50b05a1f-a9e2-4ea0-b5d3-fd72c37dfcae
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.